Resources-Gold-Technology

 

Integrated Gold Mine Facility (IGMF)

Back

Main-Menu

Forward

Resources-Integrated-Gold-Mine-Facility-(IGMF)

Integrated Gold Mine Facility (IGMF) by Resources Gold Technology

 

Resources Gold Mine Surface Infrastructure is designed to provide a single integrated gold milling facility optimizing vertical space and accommodating almost all surface operations in a highly compact footprint. Resources Integrated Gold Mine Facilities greatly reduce capital expenditure while offering full surface logistical functionality in a single mine surface infrastructure.

 

A gold plant often consists of many common and costly structures usually considered necessary for ore milling. Resources optimizes construction space accommodating even the most stringent permitting requirements and minimizing environmental impact. Resources Integrated Gold Mine Facilities constitute the entire materials handling, crushing and screening and gold processing plant operation together with administrative functionality and personnel requirements needed for operation of a gold plant.

 

 

 

Resources Integrated Gold Mine Facility installations include: 

  • Complete Mine Surface Infrastructure Building with Insulation and HVAC.
  • Resources Modular Gold Plant Complete.
  • Crushing and Screening Plant with Noise Insulation and Dust Control.
  • Variable Speed Ball Mill.
  • Concentrate Filter Press.
  • 10 ton remote controlled overhead crane with a travel covering all areas requiring crane maintenance and gold product handling.
  • Large bay door access for maintenance and operation as well as man doors in compliance with OSHA and other safety standards.
  • Loader Accessibility:  Complete loader access throughout the facility for routine clean-up of spillage. 
  • 4 stories of office space accommodating the full mine personnel complement including:
  • General Manager
  • Mine Manager
  • Mill Manager
  • Metallurgical Manager
  • Engineering
  • Shift Supervisors
  • Operators
  • Metallurgical
  • Geological
  • Safety
  • Survey
  • Administration
  • Fully equipped "mine-dry" change house facility providing for up to 150 employees.
  • A complete gold assay laboratory with assay capability including all equipment.
  • Management conference rooms.
  • Office furnishings and computer equipment. 
  • Bulk meeting area "bullpen".
  • Mine Air Compressors.
  • Resources Dewatering Plant Including:
  • Tailings Thickener with Underflow Pumps.
  • Resources Compact Flocculant Plant Complete.
  • Slurry holding tank with 10 hour storage capacity.
  • Horizontal Belt Filter with Vacuum Pump and Accessories.
  • Slewing conveyor for stacking of belt filter product.
  • Concrete stacking pad complete with roof structure.
  • Process water tank and return pumps.
  • Capital Spares and 2 year Operational Spares.
  • 2 year Warranty.

 

All Resources Gold Mine Facilities are manufactured and constructed in the State or Country of location of the project using Resources audited local manufacturers and local labor. Resources gold plant installations include the latest technology innovations from Resources international experience base. Resources Gold Technology continues to drive gold processing forward to produce the most advanced and highly proven gold processing plants to be found in the worldwide gold mining industry.

Back

Main-Menu

Forward