+ How much does a metallurgical study cost?
Pricing depends on the scope of work needed and the extent of pre-feasibility work already done and can only be determined on review.
+ What information do you need from me to provide a price for a metallurgical study?
Results of pre-feasibility work carried out including:
• Geological reports and mineralogy. • Sampling data. • Assay results. • Intended process route. • Intended throughput.
On review of this information Resources Gold Technology will be able to establish a scope of work.
+ What do you need to perform the study?
A representative bulk sample of the gold ore obtained from geological investigation and drilling.
+ How long does a metallurgical study take?
Metallurgical studies will require 1 to 3 months to complete.
+ What do I get at the end of the study?
A comprehensive metallurgical report is prepared including data, test methodology, results, conclusions and recommendations.
|